
{"id":1432,"date":"2025-12-02T12:17:15","date_gmt":"2025-12-02T04:17:15","guid":{"rendered":"https:\/\/www.northpwr.cn\/?p=1432"},"modified":"2025-12-03T16:35:56","modified_gmt":"2025-12-03T08:35:56","slug":"common-fault-maintenance-and-maintenance-precautions-for-power-distribution-cabinets","status":"publish","type":"post","link":"https:\/\/www.northpwr.cn\/tr\/company-news\/common-fault-maintenance-and-maintenance-precautions-for-power-distribution-cabinets\/","title":{"rendered":"Elektrik da\u011f\u0131t\u0131m kabini i\u00e7in yayg\u0131n ar\u0131za onar\u0131m\u0131 ve bak\u0131m \u00f6nlemleri"},"content":{"rendered":"<p>Da\u011f\u0131t\u0131m kabini genel ar\u0131za bak\u0131m ve bak\u0131m \u00f6nlemleri Da\u011f\u0131t\u0131m kutusu, ayn\u0131 zamanda da\u011f\u0131t\u0131m kabini olarak da adland\u0131r\u0131l\u0131r; bu terim, motor kontrol merkezinin genel ad\u0131d\u0131r. Da\u011f\u0131t\u0131m kutusu, elektrik tesisat\u0131n\u0131n gereksinimlerine g\u00f6re anahtar cihazlar\u0131, \u00f6l\u00e7\u00fcm aletleri, koruma cihazlar\u0131 ve yard\u0131mc\u0131 ekipmanlar\u0131 kapal\u0131 veya yar\u0131 kapal\u0131 metal bir kabin veya panoda bir araya getirerek d\u00fc\u015f\u00fck gerilimli g\u00fc\u00e7 da\u011f\u0131t\u0131m cihaz\u0131 olu\u015fturur. Da\u011f\u0131t\u0131m kutusunun \u00f6zellikleri \u015funlard\u0131r: k\u00fc\u00e7\u00fck boyut, kolay kurulum, \u00f6zel teknik performans, sabit konum, yap\u0131land\u0131rma fonksiyonu, mekan s\u0131n\u0131rlamas\u0131 olmamas\u0131, nispeten yayg\u0131n uygulama, istikrarl\u0131 \u00e7al\u0131\u015fma, y\u00fcksek alan kullan\u0131m\u0131, az yer kaplamas\u0131 ve \u00e7evre dostu etkidir.<\/p>\n<p>Da\u011f\u0131t\u0131m kabini bak\u0131m\u0131<\/p>\n<p>1. Devre kesici a\u00e7\u0131lam\u0131yor 1. A\u00e7ma d\u00fc\u011fmesine bas\u0131n, ancak a\u00e7ma bobini elektrikli ancak \u00e7al\u0131\u015fm\u0131yor \u2013 alt gerilim bobinini de\u011fi\u015ftirin; 2. A\u00e7ma d\u00fc\u011fmesinin temas\u0131 zay\u0131f \u2013 a\u00e7ma d\u00fc\u011fmesini de\u011fi\u015ftirin; 3. Kontrol devresinin eriyen \u00e7ekiri (sigorta) yan\u0131yor \u2013 eriyen \u00e7ekiri de\u011fi\u015ftirin; 4. Devre kesicide enerji depolama yok \u2013 motor voltaj\u0131n\u0131n 85%'den fazla oldu\u011fundan emin olun; 5. A\u00e7ma solenoidinin voltaj\u0131 \u00e7ok d\u00fc\u015f\u00fck \u2013 a\u00e7ma solenoidinin voltaj\u0131 85%'den fazla olmal\u0131d\u0131r; 6. A\u00e7ma solenoidi hasarl\u0131 \u2013 a\u00e7ma solenoidini de\u011fi\u015ftirin; 7. \u00c7ekme devresinin ikincil devresinin temas\u0131 zay\u0131f \u2013 \u00e7ekme devresini d\u0131\u015far\u0131ya \u00e7\u0131kar\u0131n, ard\u0131ndan tekrar ba\u011flanan konuma iterek ikincil devrenin g\u00fcvenilir \u015fekilde ba\u011fland\u0131\u011f\u0131n\u0131 kontrol edin; 8. 10.000 tur anahtar\u0131 duru\u015f pozisyonunda \u2013 anahtar\u0131 g\u00fc\u00e7 iletim pozisyonuna getirin.<\/p>\n<p>2. Gelen kabinin ana anahtar\u0131 a\u00e7\u0131lam\u0131yor 1, a\u00e7ma d\u00fc\u011fmesinin temas\u0131 zay\u0131f \u2013 a\u00e7ma d\u00fc\u011fmesini de\u011fi\u015ftirin; 2. A\u00e7ma bobini yan\u0131yor \u2013 a\u00e7ma bobinini de\u011fi\u015ftirin.<\/p>\n<p>3. Ana \u00f6l\u00e7\u00fcm reaktif g\u00fc\u00e7 metre ters d\u00f6n\u00fcyor veya d\u00f6nm\u00fcyor 1, kapasitans kompanzasyonunun g\u00fc\u00e7 fakt\u00f6r\u00fc y\u00fcksek \u2013 kapasitans kompanzasyonunu 0,92-0,97 seviyesine ayarlay\u0131n; 2. Trafo giri\u015f hatt\u0131n\u0131n faz s\u0131ras\u0131 yanl\u0131\u015f \u2013 faz s\u0131ras\u0131n\u0131 yeniden ayarlay\u0131n; 3. Gerilim ve ak\u0131m devresi normal \u2013 reaktif g\u00fc\u00e7 metreyi de\u011fi\u015ftirin.<\/p>\n<p>D\u00f6rd\u00fcnc\u00fc olarak, kondansat\u00f6r kabini otomatik olarak devreye girilemiyor 1, ak\u0131m \u00f6rnekleme sinyal hatt\u0131 ba\u011flanmam\u0131\u015f \u2013 ak\u0131m \u00f6rnekleme sinyal hatt\u0131n\u0131 ba\u011flay\u0131n; 2. Kontrol\u00f6r\u00fcn eriyen \u00e7ekiridinin yanmas\u0131 nedeniyle kompanzasyon yap\u0131n \u2013 eriyen \u00e7ekiri de\u011fi\u015ftirin; 3. Gerilim y\u00fcksek ve kontrol\u00f6r a\u015f\u0131r\u0131 gerilim g\u00f6steriyor \u2013 a\u015f\u0131r\u0131 gerilim koruma noktas\u0131n\u0131 ayarlay\u0131n; 4. Ak\u0131m d\u00fc\u015f\u00fck ve kontrol\u00f6r \u00f6n planda g\u00f6steriliyor \u2013 ak\u0131m\u0131 y\u00fckselttikten sonra otomatik olarak \u00e7al\u0131\u015fabilir; 5. Kondansat\u00f6r kabini kompanzat\u00f6r\u00fcnde a\u015f\u0131r\u0131 gerilim g\u00f6r\u00fcl\u00fcyor \u2013 gerilim de\u011ferini yeniden ayarlay\u0131n.<\/p>\n<p>Be\u015finci olarak, \u00e7ekme \u00e7\u0131k\u0131\u015f hatt\u0131 elektrik enerji metresi d\u00f6nmedi 1, ikincil tak\u0131labilir kontakt\u0131n temas\u0131 zay\u0131f \u2013 ikincil tak\u0131labilir kontakt par\u00e7as\u0131n\u0131 yeniden ayarlay\u0131n; 2. Ak\u0131m ve gerilim normal \u2013 elektrik enerji metresini de\u011fi\u015ftirin.<\/p>","protected":false},"excerpt":{"rendered":"<p>Da\u011f\u0131t\u0131m kabini genel ar\u0131za bak\u0131m ve bak\u0131m \u00f6nlemleri Da\u011f\u0131t\u0131m kutusu, ayn\u0131 zamanda da\u011f\u0131t\u0131m kabini olarak da adland\u0131r\u0131l\u0131r; bu terim, motor kontrol merkezinin genel ad\u0131d\u0131r. Da\u011f\u0131t\u0131m kutusu, anahtar cihazlar\u0131, \u00f6l\u00e7\u00fcm aletlerini, koruma cihazlar\u0131n\u0131 ve yard\u0131mc\u0131 ekipmanlar\u0131, kapal\u0131 veya yar\u0131 kapal\u0131 metal bir kabin veya panoda gereksinimlere g\u00f6re bir araya getirir [\u2026]<\/p>","protected":false},"author":2,"featured_media":1433,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"none","footnotes":""},"categories":[66],"tags":[],"class_list":["post-1432","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.northpwr.cn\/tr\/wp-json\/wp\/v2\/posts\/1432","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.northpwr.cn\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.northpwr.cn\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.northpwr.cn\/tr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.northpwr.cn\/tr\/wp-json\/wp\/v2\/comments?post=1432"}],"version-history":[{"count":2,"href":"https:\/\/www.northpwr.cn\/tr\/wp-json\/wp\/v2\/posts\/1432\/revisions"}],"predecessor-version":[{"id":1437,"href":"https:\/\/www.northpwr.cn\/tr\/wp-json\/wp\/v2\/posts\/1432\/revisions\/1437"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.northpwr.cn\/tr\/wp-json\/wp\/v2\/media\/1433"}],"wp:attachment":[{"href":"https:\/\/www.northpwr.cn\/tr\/wp-json\/wp\/v2\/media?parent=1432"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.northpwr.cn\/tr\/wp-json\/wp\/v2\/categories?post=1432"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.northpwr.cn\/tr\/wp-json\/wp\/v2\/tags?post=1432"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}